Work Breakdown Structure (WBS): How to Import Detailed WBS Project Data in PSOhub

Import projects with detailed Work Breakdown Structures, contract lines, and product data using the WBS import wizard

Published: 1 June 2026

Audience

  • Admin

Objective

This article explains how to use the Project WBS import to bring detailed Work Breakdown Structure (WBS) data into PSOhub, including contract lines, quantity, price per unit, and linked products. The WBS import includes data validation steps to ensure accuracy before projects are created.

 

Prerequisites

You must have Admin access in PSOhub.

Contract templates with contract lines must already exist in PSOhub. Contract                             template names and contract line names in your import file must match existing                         entries exactly.

Product price lists must be set up and linked to the relevant contract lines.

The PSOhub Project Import WBS Excel template must be downloaded and completed            before starting the import.

 ⚠️ Important: Only the official PSOhub Project Import WBS template is supported. Do                 not modify the column structure or sheet names. 

Key Rules and Validation Requirements

Before preparing your import file, note the following:

  • Supported contract line type: Only Product contract lines are supported in the WBS import.
  • Database matching: Contract template names and contract line names must match existing entries in PSOhub exactly.
  • Product price list: The price list referenced in the file must match the price list linked to the contract line in PSOhub.
  • Project consistency: For each project, the values for Business Unit, Currency, Customer Name, Project Manager, Contract Template, Invoice Contact, Date, Stage, and Type must be consistent across all rows belonging to that project.
  • Billing Frequency Start Date: Only allowed for recurring products.
  • New customers and contacts: PSOhub automatically creates new company or contact records if they do not yet exist in the database.
  • Batch size: For optimal performance, import a maximum of 20 projects per batch. If you need to import more than 20 projects, split the data into smaller batches and process each batch separately.

Steps

Step 1: Download the Import Template

Download the official PSOhub Project Import WBS Excel template and complete it with your project data before starting the import.

 ⚠️ Important: Only this template is supported. Do not modify the column structure or s               sheet names.

Step 2: Open the import wizard

  1. Navigate to Project Management from the main menu.
  2. Click Import in the top-right corner of the Projects overview. 
  3. The Select import type dialog opens with two options:
Option Description
Project Quickly import projects with core information like customer details, budget, and dates. Use for initial setup.
Project WBS Import projects with detailed Work Breakdown Structures (WBS) and contract lines. Includes data validation steps.

       4.   Click Project WBS.

Step 3: Upload Your File

The Import Projects Wizard opens.

       5.   Click here in the wizard description to download the Excel template if you have not already                    done so.

       6.   Drag and drop your completed Excel file into the upload area, or click to browse and select                    the file. 

 📌 Note: The file must be an XLSX file, up to 5 MB. 

Step 4: Validate Your Data

       7.   Click Step 2: Validate data. PSOhub checks the uploaded file for errors.

       8.   If errors are found, a Warning message appears. Click OK.

       9.   Review the Errors column and the error summary displayed in the wizard.

     10.   Correct the errors in your Excel file and click Re-upload document (shown in red) to upload                     the corrected file.

      11.   Repeat the validation until no errors are detected. When validation passes, a confirmation                      message appears. Click OK.

Step 5: Start the Import

      12.   Click Step 3: Start Import.

The project data loads and displays each project's name, total contract value, business unit, and contract template name. Use the pagination at the bottom of the screen to review each project when importing multiple projects.

Step 6: Validate Projects

       13.   Click Step 4: Validate project.

Each project is reviewed individually before the final import.

        14.   Review the validated projects. The total number of successfully validated projects is                                   displayed at the bottom of the screen. 

 💡 Tip: While reviewing validated projects, you can edit the Contract Line Template,                     Contract Line Description, QTY, Unit Price, and Cost Price fields directly in the table           before importing. 

Step 7: Import all Projects

        15.   Click Step 5: Import all projects.

        16.   A confirmation dialog appears. Click OK to proceed with creating the projects. 

Result

PSOhub begins creating the projects in the background.

You will receive two emails:

  • A first email confirming that project creation has started.
  • A second email confirming that all projects have been created successfully.

Once you receive the completion email, open each project in the Projects overview to verify that all contract values are correct.

 ⚠️ Important: Always verify contract values after import. For best results, import a                       maximum of 20 projects per batch. 

Next Steps

✅ Import standard project data
Use the Project import for a faster, simpler import of core project information without WBS detail. Import Projects: How to Import from an Excel File 

✅ Set up a contract template
Ensure your contract templates and contract lines are correctly configured before your next WBS import.
 How to Create a Contract Template in PSOhub 

✅ Create a product and link it to a price list
Make sure your products and price lists are set up correctly so they can be referenced in your WBS import file.
 Create a Product and Link it to a Price List 

Related Articles